It will supply storage for 240,000 tonnes of grain at four different Nibulon sites in Ukraine. In addition, it will provide industrial silos to Novotech, which has started construction of a new grain terminal in the commercial port of Odessa.
The terminal will move 3 million tonnes of grain per year and will be able to accommodate vessels with lengths of up to 250 meters and draughts of up to 11 meters. The terminal will comprise a port elevator with a storage capacity of up to 110 tonnes. The construction is planned in four stages and is expected to be completed in 2019.